The basic construction company, ‘MS PILE’ for human, residence, and environment
MS PILE specialized in laying the foundation and reinforcement of foundation only using Korean materials.
BUSINESS OVERVIEW
The business outline of MS PILE
Environmental protection
Recycling, reusing
Reuse of the steel pipe (using the scrap metal, etc.) when a building is dismantled
Enough size
Steel pipe 76.3 ~ 457.2 <BR> Wings 150 ~ 1150
Remarkable bearing power
Foundation reinforcement, Strong at disaster and earthquake
Environmental protection
Able to response to various layers such as soil and clay ground, etc.
Cost saving
Able to construct on a skeleton crew in a short period regardless of the weather
Dismantlement cost reducing
Reuse of the steel pipe or the scrap metal can be sold when a building is decrepit or reconstructed
No pollution
Able to construct in downtown with low noise and vibration
Good use of space
Able to construct anywhere in a small area
Reliability
Application of identical specifications with the certification process of Ministry of Land, Infrastructure, Transport, and Tourism in Japan where frequent natural disasters occur.
ORDER OF WORK PROGRESS
ORDER OF WORK PROGRESS
Review and design, check the building schedule
Check the building location and map and figure out the surroundings such as wire and utility pole before using the heavy equipment
Check the boring data for the ground survey
Determine the building location, check N value based on the boring data, and set the goal torque
Determine the specifications of the steel pipe and set the quality, length, necessary quantity based on the boring data
Take pictures in every construction process and write a report with scanning materials
PROGRESS
PROGRESS
STEP 1
Preparation stage before the construction.
STEP 2
According to the consultation with the builder (about quality management, process control) (specify below)Arrangement of the flat pile: Write the plan on the basic pile core, the length of the pile per a one (upper length + lower length), the external diameter of the pile, and the height of the pile levee crown according to GL
(Steel pipe/Wings)
STEP 3
upply materials such as the quality of the steel pipe, length, thickness, external diameter depending on the design drawing.
STEP 4
Put the quality of the steel pipe, length, thickness, external diameter, etc. to the site depending on the working drawing.
STEP 5
Check the heavy equipment is appropriate for length and external diameter according to the construction plan.
STEP 6
Check the construction order, management figures, etc according to the construction plan.
STEP 7
Make sure the depth of the fore-end (whether the fore-end reached the layer) or the location of the pile core and steel bar.
write
STEP 8
Attach the pictures of the construction and the actual measurement value after the building.
HISTORY
This is our career.
HISTORY
This is the career of MS PILE, the basic construction company for human, residence, and environment.
ORGANIZATION CHART
This is the organization chart of MS PILE, the basic construction company for humans, residence, and the environment.
CERTIFICATION
We own following certifications.